About IVCC Grinnell



Construction Project Update

Outside view of IVG addition
Construction is underway at Iowa Valley Community College Grinnell. The Learning Studio addition and interior remodeling will be complete when students return to classes this fall. Shown above is the exterior of the addtion taken this spring. The facility includes six new learning studios that can be configured for many different classroom uses.
View from the loft of IVG new addition
This view from the loft area, accessible by steps and a lift, shows the atrium and center court below. The loft will provide a study lounge and various meeting areas for students to gather and enjoy.
IVG openness of new addition
Natural light will fill the hallways as from vision panels that provide views of the park-like setting outside.
IVG windows in addition
Windows are key in the addition design and will fill classrooms with daylight. The photo shows where there will be an outdoor gathering area to enjoy.
IVG interior walls of addition
Interior walls have been constructed to create many small gathering areas throughout the building where students and faculty can interact and engage in learning.

 

Home | MCC | Course Schedules | Library | Student Records | Transcripts | Contact Us

123 6th Avenue West, Grinnell, IA 50112 Ph: 641-236-0513 E: grinnellinfo@iavalley.edu